Search results
592
results
(showing
491
to
499
of
592)
Checklists
and nonessential communication should be withheld
until the aircraft is stopped and the brakes set.
4−3−20.
Last updated: 17 November 2021
X.3 Guidance on the Requirements for Acceptance, Handling and Stowage
X.3.1 Acceptance Check
Before a consignment consisting of a package or overpack containing dangerous goods, a freight container containing radioactive material or a unit load device containing dangerous goods is first accepted for carriage by air, the operator must, by use of a checklist, verify the following:
a) the documentation or, when provided, the electronic data is compliant with the applicable requirements
b) the quantity of dangerous goods stated on the dangerous goods transport document is within the limits per package on a passenger or cargo aircraft as appropriate;
c) the package, overpack or freight container marks accord with the details stated on the accompanying dangerous goods transport document and is clearly visible;
d) where required, the letter in the packaging specification marking designating the packing group for which the design type has been successfully tested is appropriate for the dangerous
Last updated: 12 February 2025
The initial screening checklist (CAP2381) is not
guidance on how to write an AEE but describes how
we consider whether the minimum information has
been provided and if your AEE is suitable for public
consultation.
Last updated: 22 September 2026
Follow the IAM SAFE checklist
before the flight.
Last updated: 08 November 2024
— A schedule for the accomplishment of the checklist items.
Last updated: 22 November 2021
Before ‘define’ gateway (produced and published by the change sponsor)
'define’ gateway submission, including:
current-day scenario
list of design principles
related engagement evidence
completed submission checklist.
Last updated: 15 September 2026
The Strengths and Difficulties Questionnaire (SDQ) and
Regional Project on Child Development Indicators (PRIDI) were the measured
outcomes at 3 years of age and the Child Behaviour Checklist (CBCL), and
International Development and Early Learning Assessment (IDELA) were the
outcomes at 6 years of age.
Last updated: 04 May 2022
They
are not applied as a checklist and do not impose academic review standards on HAL's document.
Last updated: 16 July 2026
The time
taken to complete Stage 4 will be determined by the size, scale and complexity
of the temporary or trial airspace change proposal.
6.2 Change sponsors are supported in this stage by a checklist of requirements and
a standard format template for the submission.
Last updated: 15 September 2026