Search results
582
results
(showing
461
to
468
of
582)
Finalise compliance checklist
Produce regulation for this issue.
Last updated: 23 May 2022
Safety Operations Manual Licensing Statement
v.2.1
25.08.2021
Safety Operations Manual Guidance and Checklist
The following pages have been developed as guidance to be used when producing a Safety Operations
Manual (SOM), in accordance with the provisions of the Space Industry Regulations 2021 (SIR) Part 8,
Chapter 4, Section 4 and Schedule 5, to be submitted to the UK Civil Aviation Authority (CAA) as part
of a licence application or whenever a change is made.
Last updated: 21 September 2021
This publication includes a facilitators guide
and a planning checklist for arranging events, venue, publicising, final
8 Engaging with disabled people: an event planning guide (equalityhumanrights.com)
https://www.equalityhumanrights.com/sites/default/files/housing-and-disabled-people-engaging-with-disabled-people-event-planning-guide.pdf
CAP 3006 Review of the year
August 2024 Page 13
preparations, and on the day.
Last updated: 07 August 2024
Development of planning guidance / checklists for
RPAS community to be published on CAA website.
2.
Last updated: 07 June 2022
Findings
Appendices
53
Ref Serv ice element Observ ation and Recommendation Rating Management comments
7.2J
Passenger Operational and
Airl ine Operational
Av ailability of quality assurance checklists
As part of our work we tested a sample of end product checks to validate that end
product checker checked to see that the work order downtime was accurately recorded.
16 from a sample of 25 end product checks did not have evidence of the end product
check completed.
Last updated: 13 June 2017
However, LPLD does not appear to be a leading causal factor in
the accident: the immediate cause was that the flight crew had not retracted the
speed brakes prior to landing – the crew had deviated from SOP and the aircraft flight
manual; there was inadequate crew resource management and incomplete checklist
procedures.
3.4.2 One Expert commented:
“Low drag, minimum power approaches have been in place for many years and
in our experience do not seem to be a problem.”
3.4.3 No Experts mentioned current LPLD approaches as a safety issue.
3.5 Use of ‘non-precision’ runways
3.5.1 The literature contains some strong statements about the use of ‘non-precision’
runways.
Last updated: 01 July 2004
Exercise 1a Aeroplane or TMG Familiarisation
Aircraft construction and characteristics
Normal exits
Cockpit layout
Aircraft systems
Use of the checklist and Pilot Operating Handbook/ Aircraft Flight Manual
Exercise 1e Emergency and Abnormal Procedures
Fire on the ground
Cockpit fire in the air
Engine fire in the air
Systems failures
Emergency equipment and drills, emergency exits
Exercise 2 Preparations for flight and actions after flight
Personal preparation
Flying equipment required
Weather forecasts and actual reports
NOTAMs and AIS information
Flight authorisation, aircraft serviceability and acceptance
Booking-out procedures
Airfield sense
Refuelling procedures
External checks
Internal checks
Seat, harness and rudder adjustment
Starting
Power and pre take off checks
Local procedures
Closing down checks
Parking, moving, security and tie down
Exercise 3 The Air Experience Flight
The air experience flight
Exercise 4 Effects of Controls
Primary
Last updated: 29 May 2015
Non-regulated ADR schemes 28
Annex A: Application form 30
Annex B: Signed statement of a Director / sole trader / partner 39
Annex C: Application checklist 41
Annex D: Explanation of the term ‘deadlock’ 42
Annex E: Consumer disputes that fall within the scope of ‘trading fairly’ 43
Annex F: Complaints review process 45
Annex G: Resolving complaints that raise complex and novel issues 46
CAP 1324 Policy for ADR applicants and approved ADR entities
February 2021 Page 4
1.
Last updated: 18 February 2021