Search results
592
results
(showing
401
to
409
of
592)
This action should be included in manuals reflecting the checklist system referred to
in paragraph OPS 1.210(b) of the EU-OPS Regulation, and in all phases of training and checking.
4 Queries
4.1 Any queries as a result of this Flight Operations Communication should be addressed to the operator’s
Flight Operations Inspector (FOI), or for those who do not have an assigned FOI to the Head of Flight
Operations Policy at the following e-mail address: FOP.Admin@caa.co.uk.
13 November 2009
Recipients of new Flight Operations Communications are asked to ensure that these are copied to their 'in
house' or contracted maintenance organisation, to relevant outside contractors, and to all members of their
staff who could have an interest in the information or who need to take appropriate action in response to
this Communication.
Last updated: 13 November 2009
Recommendation 2005-24
It is recommended that Dassault Aviation review the indications likely to be seen following a failure of either
hydraulic system and, if necessary, amend the checklist accordingly.
Last updated: 07 July 2005
CAA Status - Closed
Recommendation 2004-62
It is recommended that Airbus Industrie review the content of the ENG 1(2) STALL checklist, as it appears in their
A320 QRH, to ensure that it includes all the advice and information contained in the abnormal procedure for the
same event, as laid out in their Flight Crew Operations Manual.
Last updated: 14 December 2004
It was also suggested that papers coming to the Board should consider the impact
of proposals on net zero ambitions as part of the pre-submission checklist.
Last updated: 14 December 2021
APPLICATION FORM SUBMISSION SERVICE (SUBMIT & PAY)
Checklist for submission (All applicants):
SRG1331 (this form)
Key post holder nominations - (Form SRG2115Gyro)
Floor Plan and Photos (per site)
Operations Manual
Training Manual, in separate sections per course
Safety Management System Manual / Compliance Monitoring Manual
Letter of Agreement from Airfield Manager for Training Operations to commence
Photocopy of PHOTO ID (Passport or Photocard Driving Licence for Individuals)
Once you have completed your application form, please save a copy to your device.
Last updated: 14 November 2023
The per passenger/seat
charges set out in Tables 1, 2, 3 and 4 below are payable by the applicant on demand by
the CAA.
2.3 For the purpose of this Scheme of Charges an application will be deemed to have been
received by the applicable date if the completed application form, and all supporting
information as specified in the ‘ATOL Renewal Application Checklist and Addendum’ and
the charge set out in this Scheme, have been received on or before the applicable date.
Last updated: 17 May 2016
If you read the AAIB Bulletin 9/2017 it becomes very
apparent that there were ambiguities in the checklist(s) relating to the lowering/raising of flap whilst
conducting the pre-flight ‘walk-around’ inspection.
Last updated: 03 April 2018
While the crew executes the
non-nominal checklist ENGINE
LIMIT/SURGE/STALL, they are
interrupted by a Traffic Collision
Avoidance System (TCAS) alert that
escalates into a Resolution Advisory (RA).
Last updated: 24 January 2019
It was highlighted that there was a cadre of individuals who had not
completed the mandatory health and safety checklist.
Last updated: 31 March 2025