Search results
438
results
(showing
291
to
300
of
438)
Needs attention
3.1 New airspace structures 3.2 New procedures 3.3 Airspace management
tools
Timescale: 2022-24 Driver: SES legislation and UK state requirements
Stage: Delivery Mechanism: Flexible Use of Airspace State programme
Working Group
Plan and progress
AFUA consists of improvement to the management of special use airspace (SUA) and
flexible airspace structures (FUA) for commercial and military use.
Last updated: 19 December 2019
No new conflicts of interest were declared.
4.
Last updated: 27 April 2021
No new or changed conflicts of interest were declared.
3.
Last updated: 17 June 2021
That includes accommodating new aerial vehicles like drones, advanced air
mobility and spacecraft.
Last updated: 30 January 2023
These were the object of consultation in CAP 3159 and CAP 3162 sets out the
outcome of that consultation.
17 See UK Airspace Design Support Fund rules and eligibility criteria - GOV.UK.
Last updated: 25 March 2026
These are identified in the European Commission Pilot Common Project (PCP)
Implementing Rule 716 /2014, dated 27
th
June 2014 (ATM Functionality (AF) 3, Flexible Airspace
Management and Free Route).
Last updated: 07 June 2018
For
example, using airspace flexibly is a concept where controlled airspace is in
effect ‘switched off’ when it is not in use for Instrument Flight Rules traffic.
Last updated: 01 July 2020
This cost is to be recovered from NATS (En Route)
plc (NERL) and airports;
Unmanned Aircraft Systems (UAS) – a cost of £500,000 in 2017/18 to
cover the safety aspects of work mainly involving in the mitigation of mid-
air collisions between drones and manned aircraft, plus improving the
education of drone requirements to industry.
Last updated: 17 March 2017
Question – Would you be in favour of the CAA forming a new collaborative,
diverse and inclusive ‘GA Change Panel’?
Last updated: 10 November 2020
That coupled with the growing number of new types of aviation platforms, such as
beyond visual line of sight (BVLOS) drones, means a new approach to airspace will
be required.
Last updated: 15 July 2022