Search results
2771
results
(showing
2251
to
2260
of
2771)
▪ We believe the concerns around access to data from ‘similar airports’ is valid.
Last updated: 25 January 2021
Please see the consultation document for detail on LAMP phasing
and what is to be included in Phase 2, but in summary, its scope includes all
routes into and out of Stansted, Heathrow and Luton.
Last updated: 18 December 2015
During the 2014 summer holiday season, baggage handling problems
at Heathrow and Gatwick caused significant inconvenience and
distress to passengers.
1.3 Such events have sparked considerable political interest in aviation’s
resilience.
Last updated: 24 November 2014
airports were obtained from Volpe.
2.24 The final dataset included a total of just over 162,000 participants, with 63,000
and 98,900 participants from NHS and NHS II, respectively.
Last updated: 10 May 2023
Noise levels remained constant in
control areas (far from the airport), while they decreased in 2009 before
increasing again in 2012 in treatment areas (close to the airport).
Last updated: 20 April 2021
We also seek to protect consumers via the economic regulation of
charges that Heathrow levies on the airlines using the airport.
Last updated: 21 July 2022
Also, as part of our previous work for Heathrow on opex elasticities, we estimated the outturn
elasticities at a sample of 35 large airports over the period 2013-2017.
Last updated: 11 April 2022
DRAFT AVIATION POLICY FRAMEWORK
4.1 The Government has delayed the publication of its consultation on the draft
aviation policy framework and the call for evidence on maintaining effective UK hub
airport connectivity until the summer.
4.2 Members commented on the Chancellor’s statement that he wished to explore all
options as to where airport expansion could take place with the exception of a third
runway at Heathrow.
Last updated: 19 November 2021
It
features some of the busiest airspace in the world, facilitating safe arrivals to and
departures from airports including Heathrow, Gatwick and Stansted;
• Airways are corridors of airspace connecting Control Areas and link up with airways
in other countries too.
Last updated: 30 May 2025
It asked that the paper state more clearly that it is for
Heathrow to provide the financing package for the project and the airport as a
whole (not the CAA) and that the CAA would look to secure an affordable and
financeable regulatory framework.
10.
Last updated: 18 June 2021