Search results
582
results
(showing
291
to
300
of
582)
The Customer Standards Manual (supportive of the GHM) details specific requirements
of the airport and Ground Handling Agent, including the preparation of local checklists,
etc.
Last updated: 23 March 2015
In showing compliance with this specification an operator should prepare a document,
or complete the compliance checklist given in Annex 2 detailing how the GPS/RNAV
installation complies with the Specification.
2 System Approval Requirements
2.1 Installation Criteria
The equipment and its installation should satisfy the following criteria:
NOTE: This criteria is based on EASA AMC20-4.
Last updated: 25 April 2005
Participant name:
Participant’s licence number
Team name (where applicable)
Aircraft type:
United Kingdom airspace Overflight Permission
reference (where applicable):
Location:
Date of Validation:
Foreign civilian display teams / pilots
The CAP 1724 appendix C checklist must be used
for this application.
Last updated: 07 April 2021
Page 3 of 3
Inspection Preparation Checklist
Safety Policy Yes?
Last updated: 26 September 2023
In these incidents Cabin Crew (CC)
have a long period of time – usually measured in minutes – to rehearse checklists,
brief passengers and converse with each other.
Last updated: 16 June 2008
The
method should include the following as a minimum:
(i) Vverification that standards and checklists used by the other party are
acceptable for the applicable scope;.
Last updated: 05 July 2024
They decided to carry out a diversion but were hampered by
difficulties in communications with the cabin crew and locating the appropriate checklist, since it was not clearly
identified on the index page of the QRH.
Last updated: 13 July 2004
Form SRG 1724 Issue 08 August 2022 Page 1 of 10
MAINTENANCE PROGRAMME CHECKLIST
When completed this form should be returned to the assigned Regional Office.
Last updated: 01 August 2022
Steep Approach Approval Compliance Statement and Checklist.
Last updated: 01 April 2019
SUBMISSION INSTRUCTIONS
Checklist for submission (All applicants):
SRG1175
Number of Key post holder nominations - (Form SRG1180)
Floor Plan and Photos (per site)
Operations Manual (inc.
Last updated: 14 November 2023