Search results
812
results
(showing
781
to
790
of
812)
Airspace utilization under prescribed conditions normally employed
for the mass movement of aircraft or other special requirements which cannot otherwise be
accomplished.
Last updated: 11 November 2021
More than 350
separate companies provide services at Heathrow, including catering, refuelling, de-icing,
car parking, retail, passenger assistance, ground handling and baggage handling.
Last updated: 13 March 2026
The CAA therefore commissioned BMT to undertake a follow-up study [14], with the
assistance of Westland Helicopters Limited, to consolidate the state-of-art as regards
float scoops and, specifically, to estimate the cost implications of fitting scoops to a
typical large transport helicopter.
Last updated: 16 December 2005
The issues on the operation of the Habitats Directive are:
(1) what standard of review the court should apply when considering whether there
has been a breach of the requirements of article 6(4) of the Habitats Directive;
(2) whether the Secretary of State breached the Habitats Directive in deciding that
the scheme for a second runway at Gatwick was not an alternative solution to the
scheme for the north-west runway at Heathrow on the basis that it would not
meet the “hub objective”;
(3) whether the Secretary of State breached the Habitats Directive in deciding to
exclude the Gatwick second runway scheme as an alternative solution to the
north-west runway scheme at Heathrow because it would potentially harm a
Special Area of Conservation (“SAC”) in which a priority species was present,
and that an opinion of the European Commission might be required;
(4) whether the Divisional Court erred:
(i) in distinguishing between the obligation to consider “alternative
solutions
Last updated: 19 October 2021
(iii) The Rotorcraft Flight Manual and supplements deserve special attention if a
“segmented” certification procedure is pursued.
Last updated: 27 July 2022
Estimating the cost of capital for implementation of price controls by UK Regulators
An update on Mason, Miles and Wright (2003)
Stephen Wright, Birkbeck, University of London
Phil Burns, Frontier Economics
Robin Mason, University of Birmingham
Derry Pickford, Aon Hewitt
Acknowledgements
We gratefully acknowledge the assistance of Mike Huggins, Rob Francis and Michael Yang (Frontier),
Donald Robertson (Cambridge), Ken Hori (Birkbeck) and James Fernandes (Aon Hewitt) in writing
this report.
Last updated: 02 November 2021
This approach to recovering revenue shortfalls (due to the impact of
covid-19) is broadly in line with the special arrangements put in place for other
major European ANSPs.
Last updated: 30 November 2023
Congreso de los
Diputados.
1a Changes to capex governance processes
4b Mandated design-and-build contracts
1b Separation of system planning and ops delivery
Master Plan approved on optimistic cost, schedule and scope
assumptions, with material risks (land, environmental mitigation)
insufficiently provisioned
Cost and schedule baselines required progressive re-forecasting as
execution realities emerged, rather than early corrective intervention
Risk materialisation (expropriation delays, DIA scope expansion)
addressed after approval, driving reactive cost and schedule escalation
Environmental Impact Declarations (DIAs) functioned as subsequent
regulatory gates, not constraints embedded continuously in delivery
planning
Judicial land expropriation processes operated outside the delivery
organisation’s control, with timelines incompatible with the approved
programme
Delivery executed through multiple major construction and assistance
contracts, managed
Last updated: 13 March 2026
This can provide assistance by comparing aerodrome environments and by
assessing risk levels associated with given OCA/H values.
Last updated: 04 November 2018
Very often it may not be possible for the ANSP or aerodrome operator to
demonstrate compliance with the standards without the assistance of an equipment
supplier or developer.
Last updated: 10 December 2010