We have completed the Post Implementation Review (PIR) of the Establishment of an Aerodrome Traffic Zone (ATZ) at Lee-On-Solent airspace change proposal.
As a result of our analysis we have concluded the proposal has been implemented and operated as expected. The airspace change process for Establishment of an Aerodrome Traffic Zone (ATZ) at Lee-On-Solent airspace change request implemented on 28 November 2016 has now concluded.
                        
                    As a result of our analysis we have concluded the proposal has been implemented and operated as expected. The airspace change process for Establishment of an Aerodrome Traffic Zone (ATZ) at Lee-On-Solent airspace change request implemented on 28 November 2016 has now concluded.
- Status:
 - Current
 - Review comment:
 - -
 - Version:
 - 1
 - Version date:
 - 27-Nov-2019
 - View file:
 
This publication features in the following categories.
    
         
        Provide feedback for this page