Guidance on Airspace Change Process for Level 3 and Pre-Scaled Airspace Change Proposals
This publication provides guidance to the aviation industry on the airspace change process requirements for permanent Level 3 and pre-scaled airspace change proposals.
CAP1616h has been superseded and incorporated into CAP1616j. It remains available for reference.
- Status
- Reference only
- Review comment
- CAP1616h is superseded (incorporated into CAP1616j), remains available for reference
- Version
- 1
- Version date
- 15-Sept-2026
- View file
This publication features in the following categories:
Provide feedback for this page