We use necessary cookies to make our website work. We'd also like to use optional cookies to understand how you use it, and to help us improve it.

For more information, please read our cookie policy.

Update on USA flight disruption

While US flights have resumed, there may be some follow-on disruption as airlines work to re-book affected passengers and get all services back to normal. Anyone due to travel on flights between the UK and USA should check with their airline for the latest information before heading to the airport.

read more about Update on USA flight disruption

Report of the CAA’s Post Implementation Review of London Gatwick Airport’s Modified Route 5 Runway 08 RNAV-1 Standard Instrument Departure Procedures

A report on the review completed by the CAA under Stage 7 of the Airspace Change Process, the Post Implementation Review (PIR), of the implementation of the modified Route 5 RNAV-1 Standard Instrument Departure at Gatwick Airport. The report sets out the framework within which the review has been conducted and details the data that has been analysed in order to reach the conclusions on whether the minor modification of the Route 5 design is a better replication than that achieved by the original Route 5 RNAV-1 SID implemented in November 2013.

Annex A: Route 5 Modified RNAV-1 SID Track Analysis has been published alongside this report.

Status
Current
Review comment
-
Version
1
Version date
17-Nov-2021
View file

This publication features in the following categories: