Showing 261 to 269 of 283 results
-
Regulation 2017 373 Compliance Matrix ANNEX V Part MET (DOCX)
The compliance matrix should be used as a checklist to enable you to establish the level of compliance of your organisation with the new regulation and to identify areas where further action is required.
Last updated: 24 April 2025
-
Standards Document 21(A) (PDF)
The training manual should contain the following: • Aim of the course • Aim and content of the specific course modules mailto:examiners@caa.co.uk Standards Document 21v5 June 2019 Page 45 of 52 • Lesson plans with teaching points to be covered within each module • Knowledge requirements, including sources of information • Exercise scenarios • Theoretical knowledge test papers and answers • Flight profiles to be used in the aircraft or FSTD • Aircraft checklist • Course timings • Arrangements for course tutor training, supervision, currency and refresher training 7.2 The course syllabus and training manual are to be controlled documents for the purpose of the approval.
Last updated: 22 February 2024
-
CAP 660 (PDF)
CAP 660 Chapter 3: Parachuting Operations Edition 5 | March 2020 Page 40 3.119 Reserve parachutes must be inspected and certified as serviceable on an appropriate Record of Inspection/Inspection Checklist prior to packing (BS Forms 112, 112A or 113 available at: www.britishskydiving.org).
Last updated: 22 February 2024
-
CAA Paper 2009/01 (PDF)
They decided to carry out a diversion but were hampered by difficulties in communications with the cabin crew and locating the appropriate checklist, since it was not clearly identified on the index page of the QRH.
Last updated: 22 February 2024
-
CAA Paper 2009/06 (PDF)
OPRS CHECKLISTS AMENDED TO INCLUDE A POSITIVE IDENTIFICATION DURING APPROACH.
Last updated: 22 February 2024
-
CAP1506a (PDF)
selection of addresses and differential eligibility/response rates at each airport ...................................................................................................................................... 44 7.3 Dwelling selection weight ....................................................................................................... 45 7.4 Household selection weight .................................................................................................... 45 7.5 Individual selection weight ..................................................................................................... 45 7.6 Combining weights ................................................................................................................. 46 Glossary of terms Appendices Appendix A: Contact Sheet Appendix B: Advance Letter Appendix C: The Survey Questionnaire Appendix D: Showcards Appendix E: Interviewer Instructions Appendix F: Interviewer Pack Checklist
Last updated: 22 February 2024
-
CAP1389 (PDF)
CAP 725 is not a checklist that guarantees approval as a result of following a given process.
Last updated: 22 February 2024
-
CAP 661 (PDF)
Phone: 01293 573315 Fax: 01293 573976 E-mail: Department.Certification@srg.caa.co.uk MPD: 2005-009 R1 page 2 of 2 b) Revise Chapter 05-02, Section 3 ‘Inspection Checklist Sky Arrow 650TC / TCN’, Item VI ‘Cabin’ of Sky Arrow 650TC and TCN Maintenance Manual, reference mm05.doc, to include the following additional 100 hour inspections: ’19.
Last updated: 22 February 2024
-
CAP 689 (PDF)
References: Bulletin 10/96 FACTOR F2/97 dated 3 Feb 97 RECOMMENDATION 96-46 It is therefore recommended that the CAA Flight Operations Inspectorate should promote the introduction, by Air Operator Certificate holders, of a formalised ‘rapid disembarkation’ checklist procedure to expedite the de-planing of passengers using normal passenger entry facilities during potentially serious incidents which do not require a standard evacuation and which occur before aircraft push-back, or movement under engine power, and before the cabin door evacuation slides have been armed.
Last updated: 22 February 2024