Showing 181 to 189 of 299 results
-
ATOL Policy and Regulations 2010/06 (PDF)
Please read the terms carefully and sign where appropriate to indicate consent. 12 Checklist By filling in the checklist you can make sure that you have enclosed all the information we need to process your application.
-
CAP 718 (PDF)
This encompasses the interface between humans and the non-physical aspects of the system such as procedures, manual and checklist layout, symbology and computer programmes.
-
Apply for a Part-CAMO approval AOC
Guidance for AOC holders applying for Part-CAMO approval under UK aviation regulations
A completed Form SRG1773 Part-CAMO CAME Compliance checklist.
-
CAP 437 (PDF)
An inventory checklist of equipment should be held inside each equipment cabinet/chest.
-
Factor F23/2006 (PDF)
The symptoms and resultant turbine over- temperature were consistent with an engine surge; the crew completed the appropriate checklist, which led to the engine being shut down.
-
Apply for a Part-CAMO approval non-AOC standalone
Continuing airworthiness management of Part 21 aircraft, engines and components
A completed Part CAMO CAME Compliance checklist Form (SRG1773).
-
CAP360 Part 2 (PDF)
It is recommended that the various actions necessary are summarised in a checklist in each case, particularly in respect of the fitting or securing of emergency equipment and exits.
-
Factor F40/2004 (PDF)
The crew carried out the memory items for the 'AILERON JAM OR UNCOMMANDED ROLL' checklist, but did not realise that in addition to pulling the Aileron Disconnect Handle there was also a need to apply a breakout force to the control wheel to achieve the disconnect.
-
FACTOR02/2013 (PDF)
CAA Response The CAA accepts this Recommendation and has amended the Operators Electronic Flight Bags (EFB) Checklist which is submitted as part of the Operational Approval Process.