Guidance for Sponsors currently progressing through the CAP 1616 process: Restarting a ‘paused’ Airspace Change Proposal (ACP).
The information has been subsumed into V5 of CAP 1616 please refer to CAP1616 -The Process for Changing the Notified Airspace Design
The information has been subsumed into V5 of CAP 1616 please refer to CAP1616 -The Process for Changing the Notified Airspace Design
- Status:
- Superseded
- Review comment:
- -
- Version:
- 1
- Version date:
- 30-Oct-2020
- View file:
This publication features in the following categories.
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.