Showing 1421 to 1429 of 1941 results
-
NERL CAP2553 NR23 Response 04Aug2023 (PDF)
This approach has previously been validated by the CMA in an earlier price control appeal and is currently one of the grounds of the Heathrow H7 appeals.
-
Gatwick Rp3outcomes (PDF)
Previously, the key issue affecting the London TMA was the poor resilience and performance of Heathrow; we note that both Time Based Separation (TBS) and Enhanced Arrival Management (XMAN) have been introduced there.
-
CAP1139 (PDF)
Outsourced security staff are also used by the AOC to operate baggage security at Heathrow.
-
CAP1261 (PDF)
This service is provided from the control centre at Swanwick for Heathrow, Gatwick, London City, Luton and Stansted airports. 2.3 For the purposes of this study, the CAA has maintained the definition of TANS adopted for CAP 1004.
-
Response To CAP3044 Extension Request (PDF)
November 2024 Page 1 Consumers and Markets Group To: London Airline Consultative Committee (LACC), Heathrow AOC Limited and other stakeholders By email 15 November 2024 Dear stakeholder RESPONSE TO EXTENSION REQUEST TO CAP 3044 (DRAFT H8 METHOD STATEMENT AND BUSINESS PLANNING GUIDANCE) On 6 November 2024, we published the Draft H8 method statement and business planning guidance (CAP 3044).
-
ACP1505E05 (PDF)
Unlike Heathrow and Gatwick, these holds are only used occasionally, for contingency reasons; c.
-
CAP1762IAG(CEPA) (PDF)
We also suggest cross-checks on beta and the overall cost of equity. 1 ‘Draft UK Reference Period 3 Performance Plan proposals’, CAA 2019 (CAP 1758). 2 ‘Working paper on the cost of capital: the implications of the RP3 draft performance plan for Heathrow Airport Limited (HAL)’, CAA 2019 (CAP 1762). 3‘Estimating the cost of capital for H7 - Response to stakeholder views’, PwC February 2019.
-
CAP1278 (PDF)
The study was done on 2844 children, aged 9-11years from primary schools in areas surrounding London Heathrow, Amsterdam Schiphol and Madrid-Barajas airports.
-
NERL Rp3response Redacted (PDF)
It would cause us to delay the technology programme and therefore airspace modernisation, and preparations for Heathrow airport’s runway 3.