Showing 1351 to 1360 of 1941 results
-
ARORA Group ORC Consultation Response (PDF)
Issues with the regulation of ORCs previously flagged As a hotel owner and operator both in and around London Heathrow Airport, Arora is required for certain of our properties to use and pay for a number of services included in ORCs, in particular utility services (including gas, electricity and water / sewerage services).
-
Increasing Airport Resilience Seminar Note (PDF)
The airlines highlighted particular concerns with the delay of London Airspace Management Programme (LAMP), and that they believed few improvements in resilience at Heathrow could be achieved in the absence of LAMP.
-
Enhanced Engagement Letter RM To CL 28092018 (PDF)
Civil Aviation Authority K5, CAA House, 45-59 Kingsway, London, WC2B 6TE www.caa.co.uk Telephone 020 7453 6003 Chief Executive’s Office Caroline Low Director, Airport Capacity Directorate Department for Transport 1/27 Great Minster House 33 Horseferry Road London SW1P 4DR 28 September 2018 Dear Caroline INTERIM UPDATE: ASSESSMENT OF AIRPORT-AIRLINE ENGAGEMENT ON CAPACITY EXPANSION AT HEATHROW AIRPORT (MAY–SEPTEMBER 2018) In May 2018, the Secretary of State recommissioned the CAA to advise the Department for Transport (DfT) on how well Heathrow Airport Limited (HAL) is engaging with, and responding to the airline community on its plans for capacity expansion at Heathrow airport and whether this engagement is appropriately reflecting consumers’ interests (the ‘Enhanced Engagement’ process).
-
CAP1762 Virgin Atlantic Airways (PDF)
Stewart Carter Civil Aviation Authority CAA House, Kingsway London Sent by email to: economicregulation@caa.co.uk April 2019 Re: Working paper on the cost of capital: the implications of the RP3 draft performance plan for Heathrow Airport Limited (HAL) CAP1762 Dear Stewart, Virgin Atlantic Airways welcomes the further work on the cost of capital commissioned by the CAA and produced by PwC 1 .
-
S41gatwickflybedecision (PDF)
It said that slot constraints at Heathrow meant that it could not move its Gatwick services to Heathrow.
-
Consumer Panel Minutes 9 January 2025 (PDF)
HS updated on the CAA’s work for the Heathrow price control process (H8), including a requirement for Heathrow airport to undertake consumer research to inform the approach to its business plan.
-
CAP3156 (PDF)
OFFICIAL - Public built at Heathrow Airport and that all airports and aerodromes are to make best use of their existing runways, thereby maximising the UK's overall aviation capacity and consequently the possible number of air traffic movements in UK airspace. 2.3 The Government aims to facilitate growth in aviation capacity within its legally binding climate obligations.
-
VAA Response To CAA Runway Consultation (1) (PDF)
Virgin Atlantic supports the joint airline submission that has been led by the ACC at Gatwick and LACC at Heathrow.
-
IAG CAP2265 (PDF)
Civil Aviation Authority Westferry Circus Canary Wharf London EH14 4HD Sent by email to: economicregulation@caa.co.uk 17th November 2021 Dear Sir/Madam Response to CAP2265 Economic regulation of Heathrow Airport Ltd Holding Cap for 2022 Thank you for the opportunity to respond to your latest consultation on the Economic Regulation of Heathrow: H7 Initial Proposals ("CAP2265").
-
Aviation on track for busiest Christmas in history following record breaking summer
The Civil Aviation Authority’s latest aviation trends report confirms that 2025 saw the busiest summer ever for UK aviation.
Getting expansion off the ground at Luton, Gatwick, and Heathrow, and redesigning our airways - to keep Britain connected, support jobs, and power economic growth.”