• Sponsor: London Luton Airport

    A Performance Based Navigation RNP1 SID. (This is in addition to the RNAV SID introduced in August 2015).

    Progression of the RNP1 SID development has been delayed by the sponsor. This was as discussed at the Luton Airport Community Engagement event (6 Oct 2016). Implementation is planned for the medium term, i.e. 2-3 years. 

    Last updated: 14 December 2017

    Framework briefing held with organisations considering proposal of the change 6 Nov 15
    Sponsor updated the CAA on the proposal development 22 Aug 17 
    Sponsor external consultation document (with associated appendices)  TBD 
    Sponsor's external consultation feedback report   
    Sponsor's formal airspace change proposal (date received by CAA)   
    Operational assessment by CAA   
    Consultation assessment by CAA   
    Environmental assessment by CAA   
    Decision document (CAA change approval)   
    Change implementation date   
    AIRAC distribution date / AIP amendment   
    Sponsor's analysis   
    CAA PIR assessment