As a result of our analysis, the CAA has concluded that the Instrument Approach Procedures (IAPs) to Runway 03 at Cranfield Airport PIR does show that the proposal has been implemented and operated as expected.
The CAA’s airspace change process change request implemented on 28 June 2012 for Instrument Approach Procedures (IAPs) to Runway 03 at Cranfield Airport airspace has now concluded.
- Status:
- Current
- Review comment:
- -
- Version:
- 1
- Version date:
- 31-Oct-2019
- View file:
This publication features in the following categories.
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.